Case Study · Multi-Floor Corporate Relocation

High-Rise Office Relocation with Specialist Pool Table Handling

A 24.4 m³ corporate move from an eighth-floor Stockport office to third-floor premises in Trafford Park. Sixteen desks, eighteen chairs and one pool table requiring full dismantle and reassembly.

24.4 m³

Operational scale

16 desks

Workstations

18 chairs

Seating

8th to 3rd

Floor transfer

Project Overview

EcoGreen Movers was engaged by C&R Global Logistics to relocate a substantial office inventory from an eighth-floor workplace in Stockport to third-floor premises in Trafford Park. The 24.4 m³ scope included sixteen desks, conference furniture, eighteen office chairs, storage units, a printer, a fridge-freezer, a mini-bar fridge, a sofa and kitchen furniture.

A pool table required specialist dismantling, component control and reassembly at the destination. Local service detail sits on the Stockport office relocation page.

The Complexities: Operational Risks

Three risk areas shaped the programme.

Execution and Agility: The EcoGreen Response

The Outcome

The relocation consolidated a diverse 24.4 m³ office into one coordinated programme, limiting disruption to both buildings and reducing the risk of missing parts or incorrect placement. Specialist dismantling capability removed the need for the client to appoint a separate pool-table contractor.

Zone-led unloading supported faster workplace reinstatement, and the assignment evidences operational maturity across building management, asset control, specialist assembly and corporate continuity.

Procurement Green Flags

More EcoGreen Case Studies

Every project write-up follows the same structure, so two jobs can be compared without hunting for the detail.

Get Started Today

Moving Between Multi-Storey Offices?

Send both addresses, the floor at each end and the desk and chair count. A fixed price comes back with the lift and access plan attached.

Specialist items such as pool tables and safes are quoted in, not discovered on the day.